In a sought-after Eastport Canal precinct setting, this elevated 1012m² block offers endless potential - whether you're looking to build your dream home, subdivide (STCA), or develop a dual-living investment to suit multi-generational living needs.
With a frontage of over 20 metres and R20 zoning, the property allows flexibility for a single prestige residence or two quality townhouses (subject to council approval). Positioned directly opposite a well-equipped park and only 220 metres (approx.) from the Estuary, it promises an unbeatable blend of space, lifestyle and convenience.
All the groundwork has been done - saving you time, cost and hassle.
Features & Inclusions:
• 1012m² elevated block overlooking the Eastport Canal precinct
• Electrical dome installed and 20mm water tap connection complete
• Retaining and site works completed, soil brought in and compacted
• Development approval in place for a larger/taller shed
• R20 zoning - potential for 2 townhouses (STCA)
• Potential Estuary views from the upper level
• Directly opposite a family park
• Close to Miami Plaza, Port Bouvard Marina, The Cut Golf Course & local restaurants
Bonus Drawings (Optional):
For those wishing to maximise the site's potential and Estuary views, a complete set of architectural drawings by Howes - designers of luxury homes - is available, including working drawings, building licence and engineering.
These plans are provided purely as an added bonus for buyers who wish to make use of them they are not a valuation item or negotiation factor should they not be required.
A superb location, exceptional flexibility, and incredible groundwork already complete - all that's left is to bring your vision to life.
Opportunities like this don't last long - secure your slice of Port Bouvard today!
Contact Tina Whitman 0499 071 760
This information has been prepared to assist in the marketing of this property. While all care has been taken to ensure the information provided herein is correct, Harcourts Mandurah do not warrant or guarantee the accuracy of the information, or take responsibility for any inaccuracies. Accordingly, all interested parties should make their own enquiries to verify the information.